Installation of a regulating valve should be carried out in accordance with the manufacturer's instructions and take into account the recommendations below:

  • Pressure gauges should be installed before and after the valve.
  • A strainer should be installed before the regulating valve.
  • The valve body should not be subjected to torsion, tension, bending, or compression loads.
  • The direction arrow on the body should match the direction of the medium flow at the installation site.
  • To achieve optimal regulation, it is recommended to maintain a constant pressure drop at the valve.
  • Flanged fittings in heating substations connected to heating networks may only be installed with the agreement of the heat supply organization.
  • When installing a regulating valve on a horizontal pipeline, the electric actuator should be installed facing upwards, unless otherwise specified in the installation instructions.
  • When installing on a pipeline carrying water with a temperature below 2°C, it is recommended to use a stem heater, and on a heat carrier above 130°C, a valve stem cooler.
  • Different manufacturers provide different data, but on average, it is recommended to maintain straight sections of 5DN before and 10DN after the regulating valve. Otherwise, the characteristics of the valve may differ from those stated in the technical description.

Frage : Kommentar : Rückmeldung

wo über die Antwort benachrichtigen. wird nirgendwo veröffentlicht

57

Kvs
Durchflusskoeffizient
m³/h
PN
Nennbetriebsdruck PN
bar
Ihr Produkt dem Katalog hinzufügen

Gemeinschaft von Experten

Wir sammeln eine Gemeinschaft von Experten für die Planung, Installation und Wartung von Heizungs-, Warmwasser- und Wasserversorgungssystemen in Land of dreams. Treten Sie der Gemeinschaft bei und Sie erhalten E-Mails mit Arbeitsanfragen in Land of dreams von unseren Besuchern.

Planung
Installation
Wartung
Heizung
Wasserversorgung
Klimaanlage
Werbung auf der Website
3 190 visitors yesterday
visitors per month
6 from Land of dreams
49 243 from all countries