Warning: file_get_contents(http://ip-api.com/json/3.135.194.153?fields=country,currency): failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests in /home/teren/public_html/blocks/folder.php on line 28
Recomendaciones para la instalación de filtros en forma de Y

Recomendaciones para la instalación de filtros en forma de Y

The location of mesh filters in engineering system diagrams is regulated by regulatory documents and installation instructions for pipeline fittings that require protection from mechanical inclusions in the working environment.

A mechanical filter is installed:

  • Before electric and gas boilers and water heaters.
  • Before control valves of heat flow regulators.
  • Before pressure regulators and differential pressure regulators of any design.
  • Before plate heat exchangers and some types of shell and tube heat exchangers.
  • Before mechanical flow meters, some types of ultrasonic and electromagnetic flow meters.
  • Before circulating and booster pumps, with the installation of a mesh filter being particularly important before pumps with wet rotors.

A mesh filter may not be installed if another filter is already installed on this pipeline within 10 meters.

* Explicación de los símbolos gráficos condicionales en los diagramas

pregunta : comentario : opinión

dónde notificar sobre la respuesta. no se publica en ningún lugar

61

DN
Diámetro nominal DN
mm
PN
Presión nominal PN
bar
añadir su equipo al catálogo
descatalogado
Y222
Danfoss

comunidad de expertos

Estamos formando una comunidad de expertos en diseño, instalación y servicio de sistemas de calefacción, agua caliente y suministro de agua en Land of dreams. Únete a la comunidad y recibirás emails con solicitudes de trabajo en Land of dreams de nuestros visitantes.

diseño
instalación
servicio
calefacción
suministro de agua
acondicionamiento
publicidad en el sitio web
3 190 visitors yesterday
visitors per month
6 from Land of dreams
49 243 from all countries