Water meter installation project must be carried out by a specialized organization with a license to perform this type of work. The basis for developing a water meter installation project is technical conditions issued by the water supply organization. The water meter installation project must be coordinated with the water supply organization.

The water meter project should include:

  • Calculation of maximum hourly water consumption
  • Calculation of maximum second flow rate
  • Selection of water meter
  • Calculation of pressure losses at the meter during the calculated water flow rate
  • Installation diagram of the measuring node
  • Specification for the components of the measuring node

question : commentaire : retour

où notifier de la réponse. n'est publié nulle part

99

Débit d'eau
m³/h
ajoutez votre équipement au catalogue

communauté d'experts

Nous réunissons une communauté d'experts dans la conception, l'installation et l'entretien des systèmes de chauffage, d'eau chaude et d'approvisionnement en eau en Land of dreams. Rejoignez la communauté et vous recevrez des emails avec des demandes de travail en Land of dreams de la part de nos visiteurs.

conception
installation
entretien
chauffage
approvisionnement en eau
climatisation
publicité sur le site web
3 190 visitors yesterday
visitors per month
6 from Land of dreams
49 243 from all countries