Réparation de la vanne à bille filetée

Réparation de la vanne à bille filetée

Réparation de la vanne à bille filetée

Operation

Operating the valve with an intermediate position of the ball is not allowed. The valve must be either fully open or fully closed.

The use of additional levers that extend the handle for opening/closing the valve is not allowed.

To avoid the ball sticking during operation, it is recommended to periodically open/close the valve.

To prevent hydraulic shocks, the opening/closing of the ball valve should be done slowly.

When there is a risk of the system freezing after draining, the ball valve should be opened/closed several times. The formation of ice in the ball valve is not allowed. If the ball valve was in a closed position during draining, water may remain in the flowing part of the ball, which, when frozen, can rupture the housing.

The pressure and temperature at the installation location of the ball valve should not exceed the working pressure. For most valve designs, operation with simultaneous maximum temperature and nominal pressure is not allowed.

It is recommended to clean the ball valve from dust and corrosion every six months, and if necessary, tighten the threaded connections.

Repair

Malfunction Cause Remedy
Non-hermetic sealing Damaged sealing of the ball Damage to the sealing may be caused by a ball with a layer of calcium deposits or a working environment containing solid inclusions. Disassemble the valve and replace the ball seals.
- Abrasive wear of the ball. The valve was in a semi-open position, which is not allowed. Possible if solid particles are present in the working environment that can damage the polished surface of the ball. Replace the ball or the entire valve. To prevent further damage, install a mesh filter in front of the valve.
Leakage along the valve stem Damaged stem seal ring Drain the pipeline, remove the flywheel, unscrew the tightening nut of the seal, remove the retaining ring holding the seal and the seal itself. Install a new seal, retaining ring, nut, and flywheel.
Unable to open/close The ball is stuck Replace the ball. See disassembly instructions below.

Disassembly Procedure for Brass Threaded Ball Valve

To perform maintenance on a ball valve, the area where it is installed must be emptied, and the valve must be removed.

Remove the flywheel and unscrew the nut holding the stem seal. Remove the retaining ring, stem seal, and stem itself.

The brass ball valve body is glued with sealant, so some manufacturers recommend heating the joint up to 200°C before disassembly.

Screw the threads into the valve sockets and secure one side of the body in a vise, while rotating the other side with a wrench. Remove the stem seal and ball.

question : commentaire : retour

où notifier de la réponse. n'est publié nulle part

142

DN
Diamètre nominal DN
mm
PN
Pression nominale PN
bar
ajoutez votre équipement au catalogue

communauté d'experts

Nous réunissons une communauté d'experts dans la conception, l'installation et l'entretien des systèmes de chauffage, d'eau chaude et d'approvisionnement en eau en Land of dreams. Rejoignez la communauté et vous recevrez des emails avec des demandes de travail en Land of dreams de la part de nos visiteurs.

conception
installation
entretien
chauffage
approvisionnement en eau
climatisation
publicité sur le site web
3 190 visitors yesterday
visitors per month
6 from Land of dreams
49 243 from all countries