Warning: file_get_contents(http://ip-api.com/json/3.149.239.225?fields=country,currency): failed to open stream: HTTP request failed! in /home/teren/public_html/blocks/folder.php on line 28
Recommandations pour l'installation de filtres en Y

Recommandations pour l'installation de filtres en Y

The location of mesh filters in engineering system diagrams is regulated by regulatory documents and installation instructions for pipeline fittings that require protection from mechanical inclusions in the working environment.

A mechanical filter is installed:

  • Before electric and gas boilers and water heaters.
  • Before control valves of heat flow regulators.
  • Before pressure regulators and differential pressure regulators of any design.
  • Before plate heat exchangers and some types of shell and tube heat exchangers.
  • Before mechanical flow meters, some types of ultrasonic and electromagnetic flow meters.
  • Before circulating and booster pumps, with the installation of a mesh filter being particularly important before pumps with wet rotors.

A mesh filter may not be installed if another filter is already installed on this pipeline within 10 meters.

* Explication des symboles graphiques conditionnels dans les schémas

question : commentaire : retour

où notifier de la réponse. n'est publié nulle part

61

DN
Diamètre nominal DN
mm
PN
Pression nominale PN
bar
ajoutez votre équipement au catalogue

communauté d'experts

Nous réunissons une communauté d'experts dans la conception, l'installation et l'entretien des systèmes de chauffage, d'eau chaude et d'approvisionnement en eau en Land of dreams. Rejoignez la communauté et vous recevrez des emails avec des demandes de travail en Land of dreams de la part de nos visiteurs.

conception
installation
entretien
chauffage
approvisionnement en eau
climatisation
publicité sur le site web
3 190 visitors yesterday
visitors per month
6 from Land of dreams
49 243 from all countries