Montaż automatycznych zaworów obejściowych

Montaż automatycznych zaworów obejściowych

Montaż automatycznych zaworów obejściowych

Installation of bypass valve should be performed in accordance with the installation instructions and taking into account the recommendations below.

  • A strainer filter is recommended to be installed before the bypass valve.
  • Pressure gauges should be installed before and after the valve to monitor the activation pressure.
  • The bypass valve body should not be subjected to tension, torsion, bending, or compression loads from connected pipelines.
  • Different manufacturers provide different data, but on average, it is recommended to maintain straight sections of 5DN before and 10DN after the valve.
  • The bypass valve can be installed on a horizontal, vertical, or inclined pipeline, unless otherwise specified in the installation instructions.

pytanie : komentarz : opinia

gdzie powiadomić o odpowiedzi. nigdzie nie publikowane

54

Kvs
Współczynnik przepływu
m³/h
Ciśnienie nastawy
bar
dodaj swoje urządzenie do katalogu

społeczność ekspertów

Zbieramy społeczność ekspertów w projektowaniu, instalacji i obsłudze systemów grzewczych, ciepłej wody i zaopatrzenia w wodę w Land of dreams. Dołącz do społeczności, a będziesz otrzymywać e-maile z zapytaniami o pracę w Land of dreams od naszych gości.

projektowanie
instalacja
obsługa
ogrzewanie
zaopatrzenie w wodę
klimatyzacja
reklama na stronie internetowej
3 190 visitors yesterday
visitors per month
6 from Land of dreams
49 243 from all countries