Warning: file_get_contents(http://ip-api.com/json/3.148.117.34?fields=country,currency): failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests in /home/teren/public_html/blocks/folder.php on line 28
Montaż zaworu redukcyjnego ciśnienia

Montaż zaworu redukcyjnego ciśnienia

The guarantee of long and trouble-free operation of reduction valves is their installation in accordance with the installation instructions, in addition, the following recommendations should be taken into account:

  • A strainer should be installed before the reduction valve in the direction of water flow.
  • Manometers should be installed before and after the reduction valve, necessary for adjustment and monitoring of the valve operation.
  • In responsible areas where pressure increase beyond the setting pressure is unacceptable, a safety valve should be installed after the reduction valve.
  • The mounting position of the reduction valves can be any on a horizontal, vertical or inclined pipeline, unless otherwise specified in the installation instructions.
  • The valve body should not be subjected to torsion, tension, bending or compression loads from connected pipelines.

pytanie : komentarz : opinia

gdzie powiadomić o odpowiedzi. nigdzie nie publikowane

45

Kvs
Współczynnik przepływu
m³/h
Ciśnienie nastawy
bar
dodaj swoje urządzenie do katalogu

społeczność ekspertów

Zbieramy społeczność ekspertów w projektowaniu, instalacji i obsłudze systemów grzewczych, ciepłej wody i zaopatrzenia w wodę w Land of dreams. Dołącz do społeczności, a będziesz otrzymywać e-maile z zapytaniami o pracę w Land of dreams od naszych gości.

projektowanie
instalacja
obsługa
ogrzewanie
zaopatrzenie w wodę
klimatyzacja
reklama na stronie internetowej
3 190 visitors yesterday
visitors per month
6 from Land of dreams
49 243 from all countries